Buildings,documented liketechnical plans.
Faultrix locates every finding on the plan — with axis, layer, and floor. Photos become a case file an engineer understands immediately and a court can accept.
Plan-located. Standards-cited. Verifiable.
Three selected findings from the Hofgasse 14 report.
Handrail missing over three steps. §87 para. 2 BauarbeiterSchutzVO.
Anchor fixed into plaster instead of masonry. Pull test 1.8 kN versus required 6.0 kN.
Loose flooring, axis 04–05. Maintenance entry recommended.
Four steps. One evidence chain.
From upload to signed PDF — every stage is deterministically documented, every assumption reviewable.
Capture
Any construction photos from a mobile device. EXIF data remains unchanged: time, place, device, focal length.
Locate
Postal code determines the applicable standards pack. Existing-building treatment follows the construction year automatically.
Inspect
Engine v3.1 classifies by severity. Every finding includes a confidence score and standards citation.
Report
PDF with traffic-light summary, evidence fingerprint, and audit trail. SHA-256 per capture.
One engine. Four professions.
Portfolio documentation without site visits
Tenant photos become standards-aligned findings. Prioritization plans for 12, 24, and 60 months.
Claims handling from the desk
EXIF-verified evidence file in under 24 hours. No field team, no waiting.
Conformity review with standards citation
Every finding includes a paragraph reference. Handover minutes can be generated directly from the report.
Handover without warranty exposure
Complete condition documentation at handover time. Evidence-grade for three years.
onorm-pack-v1
Versioned standards stack. Every update receives its own package version and is carried in the report fingerprint.
Free during beta.
10 analyses per verified account. No credit card. No tiers.